The heads going back in, showing the new vented loops and new pipework in the system. The heads are now properly bolted through the floor, rather than being screwed in at odd angles with short screws (!).
(At this point I didn’t replace the pump unit, but later on after the boat was launched we discovered that the flush no longer worked so it was replaced)